Special Dormitory Opens at Mother and Newborn Hospital

08/07/2024 14:21
Email Print 2562
KPL (KPL) The opening ceremony for the special dormitory of the Mother and Newborn Hospital in Vientiane took place on July 6. The event was attended by Minister of Health Bounfeng Phoummalaysith, the President’s spouse Naly Sisoulith, Director of the Mother and Newborn Hospital Sivanxay Chanthavongsack, and representatives of relevant authorities.


(KPL) The opening ceremony for the special dormitory of the Mother and Newborn Hospital in Vientiane took place on July 6. The event was attended by Minister of Health Bounfeng Phoummalaysith, the President’s spouse Naly Sisoulith, Director of the Mother and Newborn Hospital Sivanxay Chanthavongsack, and representatives of relevant authorities.

Head of Litpanya Research Design-Construction Co., Ltd., Sunatta Litpanya, stated that the construction of this special building aligns with the Ministry of Health’s development plan and policies, adhering to the government's guidelines and meeting the current needs of society.

The new building has been designed to integrate seamlessly with the existing hospital facilities for mothers and newborns. It measures 32.6 meters in width and 59 meters in length, and it is a 3-story structure housing 50 specialized rooms, categorized into four types: two VIP luxury rooms, four luxury suites, 21 VIP rooms, and 23 Deluxe rooms.

Additionally, the building features a nurse’s room, a 24-hour nurse reception station, a newborn bathroom, a medication room, an administrative office, a restaurant, a coffee shop, and a minimart. It is equipped with comprehensive technical systems, including medical systems, electrical systems (with backup power), elevators, CCTVs, Internet, water supply, and wastewater management systems.

The project’s total investment amounts to 144.6 billion kip (approximately 6.4 million USD). Of this, the company invested 101.2 billion kip (about 4.5 million USD), equivalent to 70% of the shares. The hospital contributed the rights to use 3,700 square meters of land, valued at 43.3 billion kip (equivalent to 1.9 million USD), representing 30% of the shares. The construction period was 3 years as the joint business operation term for the project is 25 years.

KPL

ຂ່າວອື່ນໆ

    • Laos-China Railway Company to Halve Vehicle Service Fees at StationsGeneral

      Laos-China Railway Company to Halve Vehicle Service Fees at Stations

      7/4/2025 9:49:31 AM

      On July 2, 2025, the Laos-China Railway Company (LCRC) announced plans to reduce vehicle service fees at railway stations for large vehicles, lowering the charge from 10,000 kip to 5,000 kip per vehicle. The decision aims to address public concerns and ensure fairness in station service charges.

    •  Heavy Rain, Flooding, and Landslide WarningGeneral

      Heavy Rain, Flooding, and Landslide Warning

      7/4/2025 9:46:39 AM

      The Department of Meteorology and Hydrology has issued a warning on July 4, 2025, for widespread rainfall due to a low-pressure trough currently moving across the northern and central regions of Laos. This weather system is intensified by prevailing southwesterly monsoonal winds, which are expected to bring light to moderate rain in most areas, with heavy rain occurring in some localities.

    • Pharmaceutical and Medical Products Business Association Officially LaunchedGeneral

      Pharmaceutical and Medical Products Business Association Officially Launched

      7/3/2025 9:05:18 PM

      The Pharmaceutical and Medical Products Business Association was officially launched in a ceremony on July 3 presided over by Madam Valy Vetsaphong, President of the Association.

    • WFP and Lao Government Host Workshop on Disability-Inclusive Early Warning MessagingGeneral

      WFP and Lao Government Host Workshop on Disability-Inclusive Early Warning Messaging

      7/3/2025 2:56:30 PM

      The United Nations World Food Programme (WFP), in collaboration with the Department of Meteorology and Hydrology under the Ministry of Natural Resources and Environment, and the Department of Social Welfare under the Ministry of Labour and Social Welfare, is convening a two-day workshop on Disability-Inclusive Early Warning Messaging in Vientiane, beginning today.

    • Korea Supports Laos in Enhancing Aviation Safety and Inspector CapacityGeneral

      Korea Supports Laos in Enhancing Aviation Safety and Inspector Capacity

      7/3/2025 12:08:25 PM

      The second phase of the Knowledge Sharing Program (KSP) project, titled "Luang Prabang International Airport Aviation Operation System Improvement Project (2nd Phase)," was officially launched at a seminar held on July 1 in Vientiane.


Top